domenica 24 settembre 2017

Progress on the boat 24.09.2017

Deck finished, gunwhale guard added,toe rails added,torpedo tube deck pads added,coamings and front turret installed,chart house test fitted.

Toe rail I

Toe rail II

Coaming to deck bracket

Torpedo loading cradle pads, drip plate, mushroom vent.

Aft gun deck pad and bofors gun base.

Mushroom vent.

Maxson  mount 10" spacer ring,as installed on the M16MGMC.

Nessun commento:

Posta un commento