domenica 24 settembre 2017

Chart House interior detail the beginning.

Overall view of chart house interior.

Chart table edging angle added,tommy gun installed,PPI pads installed.

Tommy gun close up.

And bracket (workable) still missig mounting screws.

Progress on the boat 24.09.2017

Deck finished, gunwhale guard added,toe rails added,torpedo tube deck pads added,coamings and front turret installed,chart house test fitted.

Toe rail I

Toe rail II

Coaming to deck bracket

Torpedo loading cradle pads, drip plate, mushroom vent.

Aft gun deck pad and bofors gun base.

Mushroom vent.

Maxson  mount 10" spacer ring,as installed on the M16MGMC.

Radar Dome

Aluminium support post and base ring.

Weight saving foam core

All set for pouring the dome

Pour...

and cure @45PSI

Cured

Roughly formed

Cutting out the closing tabs on the base ring

Milling the closing tabs

Milling the cutouts in the support post.

Making 6 retaining screws

All the parts required for one clasp

Clasps and final detailing added,primed.....the clasps are oversized,will substitute them with smaller ones later on..