Overall view of chart house interior. |
Chart table edging angle added,tommy gun installed,PPI pads installed. |
Tommy gun close up. |
And bracket (workable) still missig mounting screws. |
Deck finished, gunwhale guard added,toe rails added,torpedo tube deck pads added,coamings and front turret installed,chart house test fitted. |
Toe rail I |
Toe rail II |
Coaming to deck bracket |
Torpedo loading cradle pads, drip plate, mushroom vent. |
Aft gun deck pad and bofors gun base. |
Mushroom vent. |
Maxson mount 10" spacer ring,as installed on the M16MGMC. |
Aluminium support post and base ring. |
Weight saving foam core |
All set for pouring the dome |
Pour... |
and cure @45PSI |
Cured |
Roughly formed |
Cutting out the closing tabs on the base ring |
Milling the closing tabs |
Milling the cutouts in the support post. |
Making 6 retaining screws |
All the parts required for one clasp |
Clasps and final detailing added,primed.....the clasps are oversized,will substitute them with smaller ones later on.. |